Removal
Asbestos Removal Asbestos Removal Contractors Asbestos Removal Specialist Asbestos Demolition Asbestos Encapsulation
Roofing
Asbestos Roof Removal Asbestos Roof Sheet Removal Asbestos Garage Roof Removal Asbestos Roof Replacement Asbestos Gutter Removal
Interior & Cladding
Asbestos Ceiling Removal Asbestos Cladding Removal
Testing & Inspection
Asbestos Testing Asbestos Inspection CPD Accredited Asbestos Surveyor
Disposal
Asbestos Disposal Asbestos Waste Removal
Property Services
Residential Asbestos Removal Commercial Asbestos Removal Industrial Asbestos Removal
Areas – Outer West & Highway
Westville Pinetown New Germany Kloof Gillitts Hillcrest Waterfall Botha's Hill
Areas – North Coast
Durban North Umhlanga La Lucia Umdloti Ballito Stanger
Areas – South Durban
Durban South Bluff Chatsworth Queensburgh Malvern
Areas – Berea & Central
Berea Morningside Glenwood Sherwood
Areas – South Coast
Amanzimtoti Warner Beach Kingsburgh Scottburgh
Areas – Midlands & Province
Pietermaritzburg KwaZulu-Natal
Company
About Reviews Contact

Asbestos Roof Removal Durban

Get the best quote, fast
5-Star Reviewed
Home › Asbestos Roof Removal

Asbestos Roof Removal Durban covers the whole roof: sheets, ridges, flashings and usually the gutters and fascias that go with them. Most of what comes off Durban roofs is bonded asbestos cement, laid between the 1950s and the early 1990s and now at or past the end of its service life.

This page covers when a roof needs to come off rather than be left alone, how the strip is done, what it costs per square metre, and the gap between the roof coming off and the new one going on.

Roof area in square metres, single or double storey, and your suburb.

Get Asbestos Roof Removal Quotes

When A Roof Comes Off Rather Than Stays

  • Visible deterioration. Surface erosion, moss growth eating into the cement matrix, exposed fibre bundles or a chalky residue washing into the gutters.
  • Cracked or broken sheets. Storm damage, hail, or someone having walked on it. Asbestos cement is brittle and does not carry foot traffic.
  • A roof that is being worked on anyway. Solar installation, a second storey, dormer windows or re-insulating all mean drilling and fixing into the sheets, which is disturbance.
  • Persistent leaks. Patching asbestos cement means cutting and drilling it, so at that point removal is usually the cheaper long-run answer.
  • A sound, intact roof does not have to come off. If it is in good condition it can be recorded, monitored and left in place, or coated. Removal is not automatically required just because the material is present.

How The Strip Is Done

  1. Sheets sampled and confirmed by laboratory analysis, and the roof area measured
  2. Written plan of work prepared and the work notified to the Department of Employment and Labour
  3. Exclusion zone set up below the roof, ground sheeting laid, signage put up and occupants briefed
  4. Sheets wetted down to suppress fibre release, fixings cut rather than sheets broken
  5. Sheets lifted whole, lowered by hand or hoist rather than dropped, and wrapped on the ground
  6. Wrapped sheets labelled, loaded and manifested for a permitted hazardous waste site
  7. Roof structure inspected, site cleaned, disposal certificate issued and clearance arranged where required

Sheets are removed whole. Any contractor planning to break the roof up to get it into a skip is doing the one thing the method is designed to avoid, and is a reason to take a different quote.

Asbestos Roof Removal Cost

ItemIndicative rangeNotes
Removal and disposal, per square metreR180 – R420/m²Single storey, reasonable access
Double storey or steep pitchR260 – R520/m²Height and fall protection premium
Outbuilding roof, 20 – 40m²R7,500 – R18,000Minimum charge often applies
House roof, 120 – 150m²R28,000 – R65,000Removal and disposal only
Large roof, 500m²+R150 – R320/m²Rate drops with volume
Scaffolding or access platformR8,000 – R45,000Where ladders are not enough
Gutters and fascia includedR180 – R420/mUsually stripped with the roof
Temporary weather protectionR6,000 – R25,000If the gap runs into wet weather
Air clearance and certificateR3,500 – R9,000Approved inspection authority

Indicative Durban ranges, not quotations. Roof height and pitch, whether a crane or cherry picker is needed, the number of penetrations, and distance to a permitted disposal site are what move the number.

Removal and the new roof priced together so you can see the real total and the gap between them.

Compare Roof Removal Quotes

The Gap Between Old Roof Off And New Roof On

This is what catches people out. Once the sheets are off, the building is open. On a small roof the new sheeting goes on the same day. On anything larger the honest answer is one to three days, weather dependent, and in a Durban summer of afternoon thunderstorms that matters. Where there is a choice, the drier months from May to August are the easiest window. Ask every contractor two things: whether removal and replacement are in the same quote and under one programme, and what happens if it rains mid-job. A contractor who does both trades closes the gap; two separate contractors have to be sequenced by you.

Roof Structure Underneath

Asbestos cement sheets are light and are often carried on purlins spaced and sized for that weight. Swapping to heavier sheeting or to tiles can mean the timber or steel underneath has to be strengthened, and rot or borer that was hidden under the old roof only becomes visible once it is off. Budget a provisional sum for it rather than treating the quote as final, and make sure the quote says who inspects the structure and when.

Frequently Asked Questions

Can an asbestos roof be removed while we stay in the house?

Usually yes. The work is outside, the exclusion zone is below the roof line, and ceilings stay in place. You would be asked to keep windows shut, keep pets and children indoors, and keep clear of the drop zone. If ceilings are also being removed, that changes and rooms have to be emptied.

How long does asbestos roof removal take?

An outbuilding is a single day. A typical house roof of 120 to 150 square metres runs two to four days including loading and disposal. Industrial roofs are phased in sections so the building keeps operating.

Can I just paint or seal the roof instead?

Where the sheets are structurally sound, coating them is a legitimate alternative and considerably cheaper. It is not an option for cracked, eroded or friable sheets, and it does not remove the obligation to record and manage the material.

Do I need the roof tested before it is removed?

Confirmation that the sheets contain asbestos should come from a laboratory sample rather than assumption. It also protects you, because material that turns out not to be asbestos does not need an asbestos contractor or hazardous waste disposal at all.

What happens to the sheets after they come off?

They are wrapped and labelled on site, transported under a waste manifest and buried at a permitted hazardous waste facility. You should receive a disposal certificate.

Roof removal is the most common job quoted through Asbestos Removal Durban, and quotes are free to request.

Related Services

Asbestos Removal Durban is a free quote-matching service. The asbestos work is carried out by the independent registered contractors that quote you, and your contract is with the contractor you appoint. Ask each contractor for their registration and insurance details before appointing anyone.

Describe the job once and compare quotes from LEADERR APPROVED asbestos contractors covering your area.

Get 5 Quotes

Get Asbestos Roof Removal Durban Quotes

Send your roof area, storey height and suburb for removal quotes from registered contractors.

Free to use, no obligation. Your request goes to LEADERR APPROVED asbestos contractors covering your area, who quote you directly.